Month: April 2021
Floor Plan 7
Floor Plan 6
Floor Plan 5
Electricity Supply
Concealed copper wiring. Adequate light points, fan points,5 amps and 15 amps points, etc. with independent meters for each flat.
Water Supply
Ground water supply from open well/bore well.
Painting
Putty finished emulsion paint for internal walls and enamel paint for doors and window grills, external walls will be emulsion painted.
Toilet fittings
White sanitary ware including European water closet and wash basin. Good quality chromium plated taps, mixer, and shower. Towel rods.
Windows
UPVC with M.S. Grills
Doors
Pre fabricated main door with engineered wood frame, shutter and architrave.